On 7/27/2026 at 12:08 AM, Goggles & Flippers said:

Another point I've mentioned before, but I think it's worth giving it a post of its own in this thread, is the proposed training facility at Dalziel Park.

When the plans were first published, I gave my thoughts on the design and, if I'm honest, I hope the final product is significantly more ambitious than what's shown in the planning documents. However, with the extraordinary tsunami of transfer income we've generated this summer, I think it's only right that we revisit whether Dalziel Park still represents the best long-term investment for the club.

The documents submitted to North Lanarkshire Council describe this as Phase 1. That consists of the new building, equipment/storage sheds and converting the running track pitch to an all-weather surface with floodlights.

That wording itself suggests/infers there will be a Phase 2? What does that look like? Upgrading the five-a-side pitches? Covering one with indoor dome? Additional parking?

Or does it ultimately make sense to become a full club base, allowing us to move operations away from K-Park and cease renting?

If that's the intention, there are further costs to consider. We'd need facilities capable of hosting Women's and Academy fixtures. Under current SWPL 1 ground regulations, the minimum capacity is 1,300 spectators. At present we effectively work around this by using K-Park, which only holds around 660 spectators (400 seated).

A permanent home would also require things such as (from SWPL guidance):

  1. Broadcast-standard floodlighting.
  2. A press area.
  3. A main camera gantry on the halfway line.
  4. A reliable secondary power supply.
  5. Dugouts meeting competition regulations.
  6. Appropriate changing facilities and supporting infrastructure.

When the plans first appeared, a few people took a punt and estimated the building alone at somewhere between £1.5 million and £2.2 million, which doesn't seem unreasonable.

Looking at comparable projects, the additional infrastructure isn't insignificant either.

  • FIFA Quality Pro artificial pitch including engineered sub-base, shock pad and drainage: £850k-£1.1m
  • Broadcast-standard floodlighting: £150k-£250k
  • Backup generator and associated services: £80k-£100k
  • A modest 1,300-capacity stand with changing rooms, media facilities and basic hospitality: I'd struggle to see this coming in at much under £1.2m
  • Additional parking, landscaping and site works: £150k+

Obviously not everything would necessarily happen at once, but it's not difficult to see the total investment reaching £4-5 million over any multiple phases.

The other aspect I'm less clear on is ownership. Dalziel Park is a charitable trust and, unless I've misunderstood the arrangement, Motherwell wouldn't actually own the land. We may have an excellent long-term lease with favourable terms, but ultimately it would still be a major investment on a site we don't control as an asset. Happy to be corrected if I've got that wrong.

None of this is intended as criticism of any Dalziel Park facility. If the club proceeds with it, it will be a significant improvement on what we have now. Few clubs are co-located but that's down to land availability, if Celtic cold have secured 10 acres beside Parkhead, would they still prefer Lennoxtown?

What I'm really asking is whether this summer has changed the equation.

If Ravenscraig has now entered the fray to genuinely being considered for a new stadium, should we pause before committing several million pounds on Dalziel Park's phase 1 & possibly 2 and ask whether some or all of that investment would be better directed towards a wider football campus instead?

We'd still need at least three full-size grass training pitches for rotation, along with 5/7-a-side pitches. But many of the expensive elements we're potentially talking about at Dalziel Park .... hospitality, changing rooms, media facilities, floodlighting, generators, kitchens, parking, offices, catering and security, would already exist as part of a wider stadium development. Would a gym block booked from 9-12 Monday to Friday not be monetised to the public outside those hours?

The biggest challenge is the main playing surface. A natural grass stadium pitch simply isn't designed to cope with 40-plus competitive matches every season, particularly when the women's season extends into the summer and removes much of the recovery and renovation window grounds staff traditionally rely on.

That raises an interesting question. Is there a technically and financially viable way of incorporating an interchangeable natural grass and artificial surface (or second grass pitch) within the stadium footprint? It would undoubtedly consume a significant portion of any savings made elsewhere and add considerable engineering complexity, so it's far from a cheap solution.

However, if it could be achieved, the benefits are substantial. You'd create a venue capable of operating virtually 24 hours a day, 365 days a year. It could host first-team, women's and academy football, community use, multi-sport events and commercial hires, while ensuring every Motherwell FC team has a permanent home on a single site. The increased utilisation would also create revenue opportunities that simply aren't available from a stadium that's used for a couple of dozen afternoons each year.

Maybe the answer is still Dalziel Park. Maybe a split-site model remains the best option. But even with a rebuilt POD there would be a host of duplication of facilities with Dalziel Park and a weekday disconnect that doesn't exist currently.

I'm just not convinced that, after the financial position we've put ourselves in this summer, it isn't worth stepping back and asking whether our long-term infrastructure strategy should be a little more ambitious than it looked 12 months ago.

This all makes sense.  If we take bodo as the model improving the team allows more money generated.  The issue then is if we do move to a football campus as suggested in the other post then can and do we have the finances for a new stadia and a trading ground together.  
 

this makes me think that we should develop a phase 2/3 level of training ground now to improve players youth team and attract new players with the level and sophistication of the facilities and not build a new stadium.  Not ideal and I see the merit in the football campus  but don’t want to use the financial windfall just to go bust two years down the line.

 

on a side note that bodo glint stadium looks the dogs….

 

love the idea of fives pitches padel etc around it with sustainable features.  Anyone with a 100 mill spare? 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...